OracleBIBlog Search

Friday, September 11, 2009

DAC -Prune Days Can Now Be Set By Source System

In the previous releases of DAC, prune date parameter was set at the execution plan level. In DAC 10.1.3.4.1, prune dates can be set at the execution plan level for the entire plan or in the execution plan parameters for specific source connections. Dates set at the source level in the parameters override the date set at the overall execution plan level. If no dates are set at the source level in the execution plan parameters, the dates default to the execution plan level.

0 comments: